Brazil Transnordestina Railway Bridges and Viaducts

Location: Brazil

Client: Astep engenharia ltda

Completed: 2013

Scope of our work: Conceptual design; construction design

Description:

Design of 8 bridges and viaducts for the Brazil Transnordestina Railway

Type of bridge: precast prestressed concrete girders

Total length: up to 430 m
spans: up to 30 m
Superstructure width: 5.50 m
Superstructure height: up to 2.50 m